Electrismos

This PV Park was built and connected by EuroEnergy under a joint venture with a Greek Energy Company in which EuroEnergy holds 70%. The PV Park has an installed capacity of 3.8MW. The park was connected to the grid in Q4 2011 and is fully operational.