Revenia
This park is located in the municipality of Thivas, it has a nominal capacity of 7.5MW. The park was completed and connected to the grid in Q4 of 2012 and it is fully operational.
This park is located in the municipality of Thivas, it has a nominal capacity of 7.5MW. The park was completed and connected to the grid in Q4 of 2012 and it is fully operational.