L17-Karyes
This 0.49MW park is located in Kileler municipality, Larisa prefecture. The park was completed and connected to the grid in Q2 of 2013 and is fully operational.
This 0.49MW park is located in Kileler municipality, Larisa prefecture. The park was completed and connected to the grid in Q2 of 2013 and is fully operational.