L4-Ali kagia
This 0.5MW park is located in Kileler municipality, Larisa prefecture. The park was completed and connected to the grid in Q2 of 2013 and is fully operational.
This 0.5MW park is located in Kileler municipality, Larisa prefecture. The park was completed and connected to the grid in Q2 of 2013 and is fully operational.