Mpozalos
This park is located in the municipality of Almyros and it the biggest EuroEnergy owns; it has a nominal capacity of 10MW. The park was completed and connected to the grid in Q4 of 2013 and it is fully operational.
This park is located in the municipality of Almyros and it the biggest EuroEnergy owns; it has a nominal capacity of 10MW. The park was completed and connected to the grid in Q4 of 2013 and it is fully operational.